Three final things to do.. still have the neck windows to finish, the red square on the back of the saucer is going to be a logo, and one other thing that slips my mind right now (am at work).
But almost final pics.. you can see the new docking port on the upper saucer just behind the bridge and above the conference room windows now, plus the location of where the logo will go on the upper deck.